Customization: | Available |
---|---|
Cooling Way: | Air Cooling |
Style: | Portable |
Still deciding? Get samples of US$ 150/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Voltage:Dual 40V battery
Welding Process: Stick
Rated Output Current: 120A
Voltage Range: 30-84A
Welding Current Range: 30-165A
Rate Output Votage: 24±10%
No Load Voltage: 48V
Cooling Method: Intelligent air cooled
Load Duration: 25%/165A, 60%/100A, 100%/80A
Welding Thickness: Welding thickness 2-10mm
Welding Material: Steel, Mild steel, Stainless Steel, Aluminum, Copper Alloys,
Cast Iron, Brass, Bronze
Full battery welding quantity: 2.5mm/10-15pcs, 3.2mm/6-10pcs
Q: How is your company?
A: Established in 2012 and specialized in worldwide sales, our products range from the power tool, garden tool, hand tool, air tool, measurement tool and so on, the annual turnover is up to 30 million US dollar at 2023 year.
Q: How is your product?
A: We design and manufacture a wide range of both premium and affordable cordless tools that are compatible with 20V or 40V battery platform. There are three levels of quality and price - WINKKO (DIY), WINKKO Professional (Professional), WINKKO HD Professional (Heavy Duty).
Q: Are your cordless tools compatible with a same battery?
A: Yes, it's a 20V battery platform (2.0AH or 4.0AH), and we are developing the new 40V platform.
Q: What's your MOQ?
A: 300pcs per item.
Q: How to order sample?
A: Samples are available, and while sample costs, including the air delivery fee, are required upfront, they are eligible for a refund upon the placement of the first order.
Q: How long is expected for the sampling process?
A: Typically, it takes up to two weeks, excluding holidays.
Q: How long is expected for the production process?
A: Typically, it takes up to 45 days, excluding holidays.
Q: What transportation options are currently available?
A: The primary choice is sea freight, offering a cost-effective solution. Additionally, air cargo is available for urgent delivery, although it is comparatively more expensive.
Q: Which payment methods are accepted?
A: T/T, L/C, D/P, or as negotiated.